Clachan Hub Consultation: Draft Design

screenshot-2016-10-07-at-13-01-00On Wednesday 5th October, CGDT convened our 8th community consultation meeting to discuss the Clachan Hub. While we reported on progress towards the funding application, the main business of the meeting was to consider the draft plans from our architects INCH. To that end, and to continue the dialogue regarding the building, and also, because of technical difficulties in presenting the full treatment at the meeting, CGDT are publishing INCH’s presentation here now.

The document begins with the general design treatment, how it sits in the landscape, and its appearance. It then moves onto exemplars of various kinds around materials, shape and construction. Finally, the presentation discusses the internal layout.

screenshot-2016-10-07-at-12-58-54

While CGDT is very happy with the general concept, because it embodies all the feedback we have had from the community from our previous 7 meetings, the details are still very much in discussion, particularly the location of the bar / servery area in Building 01 and the access to the changing rooms in Building 02. We would welcome any comment, positive or negative, as well as thoughts on layout and structure. And of course if you have questions, please don’t hesitate!

Here’s the PDF of the entire document, please click to download –> 122-cgdt-hub-initial-proposals-b4

All feedback to cgdt@cgdt.org

Categories
Glendaruel News Opportunities Projects

The Clachan Hub Project: Community Survey

We’re gathering responses to the Clachan Hub project proposals both online and via paper forms which have been distributed to residents in Glendaruel. All members of the community, whether members of the Development Trust or not, are very welcome to fill in this survey. We also welcome the views of business owners, second-home owners and those who visit our community for their holidays.

The survey, with lots more information about the project and the purpose of the survey, is available here.

Thanks for your time!

Categories
Clachan CRtB Glendaruel Glendaruel Hotel Ideas News Opportunities Premises Projects Working Groups

Of Hall, Hotel and Hub: an Ongoing Discussion

One of the ongoing discussions we have been engaged in is seeing a way forward for Glendaruel what with the CRtB on the Hotel, the initial plans drawn up by the Hub Group and the ongoing progress the Village Hall Committee are making towards renewing the hall. To aid the community’s thinking we organised a session with all three groups at the Village Hall facilitated by Donald Walker and building on the decision-making matrix that the Development Trust has already developed.

Here’s Donald’s Review of the meeting:

The group listened to a short introduction of the aims and process and then heard 5 minute summaries of the activities of each of the working groups. The group were given the opportunity to ask clarifying questions and then worked through 2 set exercises which were designed to generate a consensus over next steps.

Using the presentations and the knowledge of the group, the team assembled a number of criteria which will be used to evaluate options. These criteria were forced ranked 1 to 10 although it was agreed that there could be an opportunity to combine or reclassify some of them at a later date.

The team then selected a number of “wants and needs” for the community and listed these in no particular order. The “wants and needs” were written in way that did not describe the solution; so, the community wants/needs access a licensed premises rather than the community wants/needs a pub. In this example, a pub is one possible solution to the requirement to access a location which is licensed to sell alcoholic beverages.

The team used a 1-3-9 scale to score the relationship between the “want/need” and the criteria where 1 = remote relationship/influence, 3 = moderate influence and 9 = strong relationship. This scale is designed to force a separation between items which have a big impact and those which don’t.

Next steps
The team agreed that this activity should not delay or derail any activities planned by the Village Hall team.

All those present agreed to re-convene for a further 2 hour meeting in the new year to complete the table. During this second session, the team agreed to define each of the criteria to improve clarity and to make the description more objective.

The team also agreed to complete a third session which would be designed to form solutions to each of the wants and needs. These solutions will be evaluated using the same approach as the prioritrisation matrix.

The presentation and matrix are attached so that all interested parties can see what was covered and participate in the process.

Glendaruel Discussion Presentation 5MB
This is Donald’s opening presentation outlining the method and the way outcomes are achieved.

XLS Spreadsheet
If you have Excel and would like to contribute your scores to our next discussion, please send them into us. Remember to score only 1s, 3s and 9s!

PDF of spreadsheet
For those of you who don’t have excel, here’s the pdf which you can open using Adobe Acrobat Reader, freely available from adobe.com